![London Docks TV Aerial System](https://capitalaerials.com/wp-content/uploads/2020/10/London-Dock-3-tv-aerial-system.jpg)
The Project
178 Apartments
Phase 1 – Completed 2017
We have installed a central satellite system for this multi-phase project with fibre optic distribution to the first 2 blocks in phase 1 (Blocks A & B serving 178no. apartments) and connection facilities to enable blocks in subsequent phases to be connected to a single set of dishes and aerials